SI-4(16) System Monitoring | Correlate Monitoring Information
Correlate information from monitoring tools and mechanisms employed throughout the system.
Source: NIST SP 800-53 Rev 5, SI-4(16). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Event correlation logs or records · SIEM / log platform
- System audit records · Policy repository / GRC workspace
- Test of Organizational processes for intrusion detection and system monitoring; mechanisms supporting and/or implementing intrusion detection and system monitoring capabilities; mechanisms supporting and/or implementing the correlation of information from monitoring tools · SIEM / log platform
governing documentDocuments that govern the control
- System and information integrity policy · Policy repository / GRC workspace
- System and information integrity procedures · Policy repository / GRC workspace
- Procedures addressing system monitoring tools and techniques · Policy repository / GRC workspace
- System design documentation · Document repository
- System monitoring tools and techniques documentation · Policy repository / GRC workspace
- System configuration settings and associated documentation · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Information from monitoring tools across the system is not correlated
- Monitoring tools feed separate consoles, so related events are never linked
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSI-4(15) System Monitoring | Wireless to Wireline Communications · SI-4(17) System Monitoring | Integrated Situational Awareness