SI-13(4) Predictable Failure Prevention | Standby Component Installation and Notification
If system component failures are detected: (a) Ensure that the standby components are successfully and transparently installed within organization-defined time period; and (b) Selection (one or more): activate [organization-defined alarm; automatically shut down the system; organization-defined action].
Source: NIST SP 800-53 Rev 5, SI-13(4). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- System audit records · Policy repository / GRC workspace
- Test of Organizational processes for managing MTTF; automated mechanisms supporting and/or implementing the transparent installation of standby components; automated mechanisms supporting and/or implementing alarms or system shutdown if component failures are detected · Document repository
governing documentDocuments that govern the control
- System and information integrity policy · Policy repository / GRC workspace
- System and information integrity procedures · Policy repository / GRC workspace
- Procedures addressing predictable failure prevention · Policy repository / GRC workspace
- System design documentation · Document repository
- System configuration settings and associated documentation · Policy repository / GRC workspace
- List of actions to be taken once system component failure is detected · Document repository
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Standby components are not installed within the defined time period after failure detection
- The selected activation or alerting actions on component failure were never configured
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSI-13(3) Predictable Failure Prevention | Manual Transfer Between Components · SI-13(5) Predictable Failure Prevention | Failover Capability