MP-8 Media Downgrading. Establish [organization-defined] that includes employing downgrading mechanisms with strength and integrity commensurate with the security category or classification of the information; Verify that the system media downgrading process is commensurate with the
Media Downgrading. Establish [organization-defined] that includes employing downgrading mechanisms with strength and integrity commensurate with the security category or classification of the information; Verify that the.
5
artefacts
1
held by a system
1
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review
system holds itEvidence a system already holds
- Verification records showing the downgrading process was tested and the information is not recoverable · Data governance / DLP tooling
periodic reviewEvidence produced at each review
- Records of each downgrade performed, including operator, method and date · Data governance / DLP tooling
governing documentDocuments that govern the control
- The defined media downgrading process, including the mechanisms used and their assessed strength · Policy repository / GRC workspace
- Categorisation documentation establishing the security category or classification the downgrade must be commensurate with · Policy repository / GRC workspace
- List of media requiring downgrading and the disposition of each · Policy repository / GRC workspace
First move
Mostly documents and reviews. Pull the 1 system-held artefact from your Data governance / DLP tooling on a schedule; put the documents under version control with an owner and review date, and log each review as a dated record with a named reviewer.
Common gaps auditors find
- Downgrading method chosen for convenience without assessing its strength against the classification
- Process verified once at introduction and never re-verified as media technology changes
- Downgraded media released with no record, so the chain of custody breaks at the point of greatest risk
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetMP-7 Media use · PE-1 Policy and procedures for physical and environmental protection