MA-7 Field Maintenance
Restrict or prohibit field maintenance on organization-defined systems or system components to organization-defined trusted maintenance facilities.
Source: NIST SP 800-53 Rev 5, MA-7. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Maintenance records · Document repository
- Diagnostic records · Document repository
- Test of Organizational processes for managing field maintenance; mechanisms implementing, supporting, and/or managing field maintenance; mechanisms for strong authentication of field maintenance diagnostic sessions; mechanisms for terminating field maintenance sessions and network connections · Identity provider / directory
governing documentDocuments that govern the control
- Maintenance policy · Policy repository / GRC workspace
- Procedures addressing field maintenance · Policy repository / GRC workspace
- System design documentation · Document repository
- System configuration settings and associated documentation · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
First move
Common gaps auditors find
- Field maintenance is performed on the defined components outside the defined trusted maintenance facilities
- The components restricted from field maintenance and the trusted facilities were never defined
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetMA-6(3) Timely Maintenance | Automated Support for Predictive Maintenance · MP-1 Policy and Procedures