MA-4(7) Nonlocal Maintenance | Disconnect Verification
Verify session and network connection termination after the completion of nonlocal maintenance and diagnostic sessions.
Source: NIST SP 800-53 Rev 5, MA-4(7). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Session/network termination logs · SIEM / log platform
periodic reviewEvidence produced at each review
- Maintenance records · Document repository
- Diagnostic records · Document repository
- Audit records · Policy repository / GRC workspace
- Test of Mechanisms implementing remote disconnect verifications of terminated nonlocal maintenance and diagnostic sessions · Document repository
governing documentDocuments that govern the control
- Maintenance policy · Policy repository / GRC workspace
- Procedures addressing nonlocal system maintenance · Policy repository / GRC workspace
- System design documentation · Document repository
- System configuration settings and associated documentation · Policy repository / GRC workspace
- Cryptographic mechanisms protecting nonlocal maintenance activities · Document repository
First move
Common gaps auditors find
- Session and network connection termination is not verified after nonlocal maintenance ends
- Maintenance connections remain open because disconnection is assumed rather than checked
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetMA-4(6) Nonlocal Maintenance | Cryptographic Protection · MA-5 Maintenance Personnel