CM-8(9) System Component Inventory | Assignment of Components to Systems
(a) Assign system components to a system; and (b) Receive an acknowledgement from organization-defined personnel or roles of this assignment.
Source: NIST SP 800-53 Rev 5, CM-8(9). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.
Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Change control records · Cloud console / configuration management
periodic reviewEvidence produced at each review
- Acknowledgements of system component assignments · HR system / LMS
- Test of Organizational processes for assigning components to systems; organizational processes for acknowledging assignment of components to systems; mechanisms implementing assignment of components to the system; mechanisms implementing acknowledgment of assignment of components to the system · HR system / LMS
governing documentDocuments that govern the control
- Configuration management policy · Policy repository / GRC workspace
- Procedures addressing system component inventory · Policy repository / GRC workspace
- Configuration management plan · Policy repository / GRC workspace
- System security plan · Policy repository / GRC workspace
- System design documentation · Policy repository / GRC workspace
- System component inventory · Policy repository / GRC workspace
First move
Common gaps auditors find
- System components are not formally assigned to a system
- No acknowledgement from the defined personnel confirms component assignments
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCM-8(8) System Component Inventory | Automated Location Tracking · CM-9 Configuration Management Plan