CA-8(3) Penetration Testing | Facility Penetration Testing

Employ a penetration testing process that includes organization-defined frequency Selection (one or more): announced; unannounced attempts to bypass or circumvent controls associated with physical access points to the facility.

Source: NIST SP 800-53 Rev 5, CA-8(3). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open NIST SP 800-53 Rev 5 in the compliance library.

Base controls and their enhancements. Which apply follows the baseline you are assessed against (for example FedRAMP Moderate or High, or the low, moderate and high baselines of SP 800-53B). Text in square brackets is a parameter your organisation sets.

10
artefacts
2
held by a system
5
at each review
hard
to go live
SIEM / log platform
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Rules of engagement · SIEM / log platform
  • Test of Automated mechanisms supporting the employment of red team exercises · SIEM / log platform

periodic reviewEvidence produced at each review

  • Procedures addressing red team exercises · SIEM / log platform
  • Results of red team exercises · SIEM / log platform
  • Penetration test report · Vulnerability scanner / patch tooling
  • Assessment report · SIEM / log platform
  • Assessment evidence · SIEM / log platform

governing documentDocuments that govern the control

  • Assessment, authorization, and monitoring policy · Policy repository / GRC workspace
  • Procedures addressing penetration testing · Policy repository / GRC workspace
  • Assessment plan · Policy repository / GRC workspace

First move

Mostly documents and reviews. Pull the 2 system-held artefacts from your SIEM / log platform on a schedule; put the documents under version control with an owner and review date, and log each review as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

CA-8(2) Penetration Testing | Red Team Exercises · CA-9 Internal System Connections