PE-16 Delivery and Removal
Controls what components enter and leave the facility and records their movement, which is the physical control point for counterfeit and tamper risk.
3
artefacts
0
held by a system
2
at each review
hard
to go live
Document repository
where the evidence lives
teal = a system already holds it · olive = produced at each review
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Delivery and removal records · Document repository
- Inspection at the point of delivery · Document repository
governing documentDocuments that govern the control
- Authorization for removals · Document repository
First move
This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.
Common gaps auditors find
- deliveries accepted with no inspection or record
- removals unauthorized and untracked