A.1.4.4 Accuracy and quality
The organization must make sure, and record, that personal data is correct, complete and current to the degree its processing purposes demand, across the whole life of the data. It must put in place policies, procedures or mechanisms that keep errors to a minimum and deal with errors when they are found, and must include these in its documented information, for instance as technical system settings.
Source: ISO/IEC 27701:2025, A.1.4.4. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open ISO/IEC 27701:2025 in the compliance library.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Quality measurement results · Document repository
governing documentDocuments that govern the control
- Documented accuracy standard, expressed relative to the purpose rather than absolutely · Policy repository / GRC workspace
- Validation and quality mechanisms at capture and through the lifecycle · Document repository
- Procedure for responding to discovered inaccuracy, including downstream correction · Policy repository / GRC workspace
First move
Common gaps auditors find
- Accuracy treated as a data quality initiative for reporting rather than an obligation owed to the individual
- Validation applied at capture with no mechanism to detect data going stale
- Inaccuracy corrected where a person complains and nowhere else
- Accuracy requirement identical across purposes, when a marketing list and a credit decision demand different standards
- Corrections not propagated to systems fed from the corrected source
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetA.1.4.3 Limit processing · A.1.4.5 PII minimization objectives