5.8.2 Continual improvement

The continual improvement requirement of ISO/IEC 27001 applies to the PIMS, so the organization must keep improving the suitability, adequacy and effectiveness of the privacy extension and not only correct it when it fai

3
artefacts
0
held by a system
2
at each review
hard
to go live
Document repository
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Improvement backlog with privacy items traceable to measurement, audit or review · Data governance / DLP tooling
  • Evidence of improvements delivered across cycles · Document repository

governing documentDocuments that govern the control

  • Link from regulatory and business change into the improvement determination · Document repository

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find