5.6.1 Operational planning and control

The operational planning and control requirements of ISO/IEC 27001 apply to the PIMS, so the processes that deliver privacy outcomes must be planned, implemented, controlled against criteria and evidenced, with changes c

4
artefacts
1
held by a system
2
at each review
moderate
to go live
Document repository
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

  • Records showing those processes ran to their criteria · Document repository

periodic reviewEvidence produced at each review

  • Change records covering privacy affecting change · Data governance / DLP tooling
  • Evidence of control over outsourced processing · Vendor register / contract repository

governing documentDocuments that govern the control

  • Process criteria for privacy relevant operational processes · Policy repository / GRC workspace

First move

Start with the 1 of 4 artefacts that already live in a system (Document repository); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

5.5.5 Documented information · 5.6.2 Information security risk assessment