EvidenceSheet

7.12 Cabling security

Requires cables carrying power, data or supporting information services to be protected from interception, interference and damage. Older source material adds routing power and telecommunications lines underground or oth

5
artefacts
0
held by a system
3
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Evidence of segregation between power and communications cabling to avoid interference · Physical access / facilities
  • Access controls over patch panels, cable rooms and risers, and records of who holds access · Vulnerability scanner / patch tooling
  • Inspection records checking for unauthorised additions, taps or undocumented connections · Physical access / facilities

governing documentDocuments that govern the control

  • Cable routing documentation showing power and telecommunications routes and any protection applied · Policy repository / GRC workspace
  • Cable and patch panel labelling standards and evidence of their application · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

7.11 Supporting utilities · 7.13 Equipment maintenance