A.7.13 Equipment maintenance
Equipment is to be properly maintained so that information stays confidential, intact and available. Purpose (stated in ISO/IEC 27002:2022): prevents loss, compromise or operational interruption caused by lack of equipment maintenance. As an Annex A reference control, it is compared with the controls determined in risk treatment (6.1.3 c) and recorded in the Statement of Applicability as included or excluded, with the justification and implementation status (6.1.3 d); implementation guidance is ISO/IEC 27002:2022 7.13.
Source: ISO/IEC 27001:2022, A.7.13. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open ISO/IEC 27001:2022 in the compliance library.
Clauses 4 to 10 are the management-system requirements: none of them can be excluded when an organisation claims conformity. The 93 Annex A controls are a reference set: one may be excluded with a justification in the Statement of Applicability. Certification bodies assess conformity; the evidence lists here are what auditors commonly ask for, not a list the standard prescribes.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Maintenance and fault logs recording faults and preventive and corrective work · Physical access / facilities
periodic reviewEvidence produced at each review
- Supervision records for on-site maintenance and authorization and logging of remote maintenance sessions · Physical access / facilities
governing documentDocuments that govern the control
- Statement of Applicability entry for control A.7.13, showing inclusion or justified exclusion, implementation status and the risks it treats · Policy repository / GRC workspace
- A maintenance programme and schedule aligned with supplier-recommended intervals and specifications, covering IT, power, fire, alarm and HVAC equipment · Policy repository / GRC workspace
- Lists of authorized maintenance personnel and signed confidentiality agreements · Policy repository / GRC workspace
First move
Common gaps auditors find
- Remote maintenance access by vendors is permanently enabled and unmonitored
- Maintenance of fire, alarm and power equipment is not tracked alongside IT equipment
- Equipment returns from repair without any check for tampering
- Engineers work unsupervised in data rooms
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetA.7.12 Cabling security · A.7.14 Secure disposal or re-use of equipment