8.3.4 Resource requirements
Determine the resources needed to implement the selected continuity solutions, considering at least people, information and data, physical infrastructure such as buildings, workplaces and facilities with their utilities, equipment and consumables, information and communication technology systems, transport and logistics, finance, and partners and suppliers.
Source: ISO 22301:2019, 8.3.4. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open ISO 22301:2019 in the compliance library.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Evidence the resource is available or contracted at the required quantity and time · Document repository
governing documentDocuments that govern the control
- Resource requirement schedule per solution covering each required resource type · Document repository
- Reconciliation between required resources and the dependencies identified in the BIA · Document repository
First move
Common gaps auditors find
- Resource analysis covering ICT only, with people, finance and logistics unexamined
- Requirements stated without quantity or time to availability
- Partner and supplier resources assumed available with no contractual basis
- Consumables and utilities omitted, so a recovery site cannot actually operate
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheet8.3.3 Selection of strategies and solutions · 8.3.5 Implementation of solutions