8.3.1 General
Using what the impact analysis and the risk assessment produced, identify and choose business continuity strategies that look at options for the periods ahead of, during and following a disruption, each strategy being made up of one or more solutions.
Source: ISO 22301:2019, 8.3.1. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open ISO 22301:2019 in the compliance library.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Record of which solutions make up each selected strategy · Document repository
governing documentDocuments that govern the control
- Traceability from BIA and risk assessment outputs into the strategy options considered · Policy repository / GRC workspace
- Options covering the before, during and after phases · Document repository
First move
Common gaps auditors find
- Only during disruption options considered, with nothing done to reduce likelihood beforehand
- Strategy stated at a level too high to name any actual solution
- Options never documented, so only the chosen one is visible
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheet8.3 Business continuity strategies and solutions · 8.3.2 Identification of strategies and solutions