EvidenceSheet

164.308(a)(1)(ii)(A) Risk Analysis (Required)

Conduct accurate and thorough assessment of potential risks and vulnerabilities to ePHI. NIST recommends the nine-step risk analysis methodology and integration with NIST SP 800-30 and the NIST RMF.

4
artefacts
0
held by a system
2
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Periodic refresh schedule · Policy repository / GRC workspace
  • Evidence of ePHI scoping · Policy repository / GRC workspace

governing documentDocuments that govern the control

  • Documented risk analysis report · Policy repository / GRC workspace
  • Risk analysis methodology aligned to NIST SP 800-30 · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

164.308(a)(1)(i) Security Management Process (Standard) · 164.308(a)(1)(ii)(B) Risk Management (Required)