SA-15 Development Process, Standards, and Tools (SA-15)
Development Process, Standards, and Tools. a. Require the developer of the system, system component, or system service to follow a documented development process that: 1. Explicitly addresses security and privacy requirements; 2. Identifies the
Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), SA-15. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Secure development standard and tool configuration records · Source control / CI pipeline
periodic reviewEvidence produced at each review
- Threat modelling and design review evidence for major releases · Document repository
- Static and dynamic code analysis reports with finding remediation · Document repository
- Vendor security questionnaires and SOC reports retained · Vendor register / contract repository
governing documentDocuments that govern the control
- SSP SA-15 statement describing the documented development process, standards and tools and how security requirements are handled · Policy repository / GRC workspace
- Secure software development lifecycle procedures · Policy repository / GRC workspace
- Software bill of materials for in scope products · Policy repository / GRC workspace
First move
Common gaps auditors find
- Vendor SOC reports collected but exceptions not analysed
- Code scan findings closed without verification of fix
- Security requirements absent from procurement templates for low value buys
- Threat modelling performed inconsistently across product teams
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSA-11(2) Developer Testing and Evaluation | Threat Modeling and Vulnerability Analyses (SA-11(2)) · SA-15(3) Development Process, Standards, and Tools | Criticality Analysis (SA-15(3))