PE-8 Visitor Access Records
Maintain visitor access records for FedRAMP-defined period (1 year); review records monthly (FedRAMP).
Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), PE-8. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Environmental monitoring readings for temperature, humidity, and water leak sensors · Physical access / facilities
periodic reviewEvidence produced at each review
- Fire suppression and UPS maintenance records · Backup / DR tooling
- Physical security policy and facility risk assessment · Physical access / facilities
- Badge access system audit log and door alarm reports · Physical access / facilities
governing documentDocuments that govern the control
- SSP PE-8 statement describing visitor log contents, one year retention and monthly review · Policy repository / GRC workspace
- Visitor register entries for sampled months and monthly review sign-off · Policy repository / GRC workspace
First move
Common gaps auditors find
- Server room doors propped open during cooling failures
- CCTV coverage gaps at loading docks and equipment delivery areas
- Tailgating observed without challenge during walkthroughs
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-6(1) Monitoring Physical Access | Intrusion Alarms and Surveillance Equipment (PE-6(1)) · PE-9 Power Equipment and Cabling (PE-9)