PE-11 Emergency Power (PE-11)
Emergency Power. Provide an uninterruptible power supply to facilitate Selection (one or more): an orderly shutdown of the system; transition of the system to long-term alternate power in the event of a primary power
Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), PE-11. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Environmental monitoring readings for temperature, humidity, and water leak sensors · Physical access / facilities
periodic reviewEvidence produced at each review
- Fire suppression and UPS maintenance records · Backup / DR tooling
- Physical security policy and facility risk assessment · Physical access / facilities
- Badge access system audit log and door alarm reports · Physical access / facilities
governing documentDocuments that govern the control
- SSP PE-11 statement describing UPS capacity for orderly shutdown or transition to generator, largely inherited from the data centre provider · Policy repository / GRC workspace
- Provider SOC 2 or FedRAMP package section covering UPS and generator testing · Policy repository / GRC workspace
First move
Common gaps auditors find
- Environmental sensor alerts route to unmonitored mailboxes
- Server room doors propped open during cooling failures
- CCTV coverage gaps at loading docks and equipment delivery areas