EvidenceSheet

MP-7 Media Use

Restrict or prohibit use of FedRAMP-defined types of media on FedRAMP-defined systems using safeguards.

Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), MP-7. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.

A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.

7
artefacts
2
held by a system
1
at each review
moderate
to go live
Endpoint management (MDM / EDR)
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Encryption configuration for portable storage devices · Endpoint management (MDM / EDR)
  • Removable media usage policy and DLP enforcement evidence · Cloud console / configuration management

periodic reviewEvidence produced at each review

  • Sanitisation and destruction certificates from approved disposal vendor · Vendor register / contract repository

governing documentDocuments that govern the control

  • SSP MP-7 statement listing media types restricted or prohibited on which systems and the technical safeguards used · Policy repository / GRC workspace
  • Endpoint control policy blocking removable media, with approved exceptions logged · Policy repository / GRC workspace
  • Media protection policy covering electronic and physical media · Policy repository / GRC workspace
  • Media inventory and labelling scheme by data classification · Policy repository / GRC workspace

First move

Start with the 2 of 7 artefacts that already live in a system (Endpoint management (MDM / EDR)); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

MP-6 Media Sanitization · PE-1 Policy and Procedures