MA-4 Nonlocal Maintenance
Approve and monitor nonlocal maintenance activities; use strong authentication.
Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), MA-4. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Remote maintenance session logs with approval tickets and MFA records · Identity provider / directory
- Maintenance ticket records with approvals and post change verification · Ticketing / ITSM
- Remote maintenance session logs with MFA and supervision evidence · Identity provider / directory
periodic reviewEvidence produced at each review
none for this control
governing documentDocuments that govern the control
- SSP MA-4 statement describing how nonlocal maintenance sessions are approved, monitored and use strong authentication · Policy repository / GRC workspace
- Vendor maintenance agreements with security clauses · Vendor register / contract repository
- System maintenance policy and approved maintenance windows · Policy repository / GRC workspace
- Maintenance personnel access list with background check status · Policy repository / GRC workspace
First move
Common gaps auditors find
- Maintenance vendors lack signed confidentiality and security clauses
- Vendor engineers granted standing access rather than session based access
- Remote maintenance sessions unmonitored after initial authentication
- Maintenance tools not sanitised before removal from secure areas
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetMA-3(3) Maintenance Tools | Prevent Unauthorized Removal (MA-3(3)) · MA-5 Maintenance Personnel