CA-6 Authorization
Senior official authorizes system; reauthorize every three years or upon significant change.
Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), CA-6. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Control assessment report with tester names and dates · Document repository
governing documentDocuments that govern the control
- SSP CA-6 statement naming the authorising official, the ATO date and the triggers for reauthorisation · Document repository
- Authorisation letter from the agency or FedRAMP and the significant change requests submitted since · Document repository
- Authorization to operate memorandum signed by the authorizing official · Document repository
- Continuous monitoring strategy with metric definitions · Policy repository / GRC workspace
- Independent assessor statement of independence · Document repository
- System security plan covering the authorization boundary · Policy repository / GRC workspace
First move
Common gaps auditors find
- Continuous monitoring metrics collected but not reported to leadership
- Assessment scope omits inherited cloud provider controls
- Reauthorization scheduled past the policy required interval
- Authorization boundary description does not match the asset inventory
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCA-5 Plan of Action and Milestones · CA-7 Continuous Monitoring