CA-2 Control Assessments
Assess controls annually (FedRAMP); third-party assessor (3PAO) required; produce SAR.
Source: FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline), CA-2. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP Moderate (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Current Security Assessment Plan and Security Assessment Report signed by the 3PAO · Policy repository / GRC workspace
- Control assessment report with tester names and dates · Document repository
governing documentDocuments that govern the control
- SSP CA-2 statement describing the annual assessment by an accredited 3PAO, the assessment plan and the resulting SAR · Policy repository / GRC workspace
- Independent assessor statement of independence · Document repository
- System security plan covering the authorization boundary · Policy repository / GRC workspace
- Plan of action and milestones tracking open findings · Policy repository / GRC workspace
- Authorization to operate memorandum signed by the authorizing official · Document repository
First move
Common gaps auditors find
- Authorization boundary description does not match the asset inventory
- POAM items past due without justification or risk acceptance
- Continuous monitoring metrics collected but not reported to leadership
- Assessment scope omits inherited cloud provider controls
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheet