EvidenceSheet

SC-4 Information in Shared System Resources

Prevent unauthorized and unintended information transfer via shared system resources.

Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), SC-4. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.

A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.

7
artefacts
3
held by a system
0
at each review
moderate
to go live
Cloud console / configuration management
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Configuration showing memory and storage clearing between tenant allocations · Cloud console / configuration management
  • TLS configuration scan results across in scope endpoints · Vulnerability scanner / patch tooling
  • Denial of service protection configuration and capacity test results · Source control / CI pipeline

periodic reviewEvidence produced at each review

none for this control

governing documentDocuments that govern the control

  • SSP SC-4 statement describing how shared resources are cleared to stop information leaking between users or tenants · Document repository
  • Cryptographic standards specifying approved algorithms and key lengths · Policy repository / GRC workspace
  • Key management procedures including rotation and escrow · Policy repository / GRC workspace
  • Network segmentation diagrams with VLAN and zone mapping · Policy repository / GRC workspace

First move

Start with the 3 of 7 artefacts that already live in a system (Cloud console / configuration management); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

SC-3 Security Function Isolation · SC-5 Denial-of-Service Protection