PL-11 Baseline Tailoring. Tailor the selected control baseline by applying specified tailoring actions
Baseline Tailoring. Tailor the selected control baseline by applying specified tailoring actions
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), PL-11. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Rules of behaviour signed by users including privileged personnel · Identity provider / directory
periodic reviewEvidence produced at each review
- Tailoring record listing each tailored control with justification and authorising official acceptance · Document repository
- Security planning meeting minutes with stakeholder attendance · HR system / LMS
governing documentDocuments that govern the control
- SSP PL-11 statement documenting tailoring decisions such as scoping, compensating controls and parameter values · Document repository
- Privacy and security integration documentation · Policy repository / GRC workspace
- System security plan with control allocation matrix · Policy repository / GRC workspace
- Information security architecture diagrams current within twelve months · Policy repository / GRC workspace
First move
Common gaps auditors find
- Privacy considerations addressed separately from security planning
- System security plan not refreshed after material system changes
- Rules of behaviour acknowledged once but not refreshed annually
- Architecture diagrams missing third party and SaaS dependencies
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPL-10 Baseline Selection. Select a control baseline for the system · PS-1 Policy and Procedures