PE-4 Access Control for Transmission (PE-4)
Access Control for Transmission. Control physical access to organization-defined system distribution and transmission lines within organizational facilities using organization-defined security controls
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), PE-4. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- CCTV retention configuration and footage spot check evidence · Physical access / facilities
periodic reviewEvidence produced at each review
- Facility cabling diagrams and inspection records for protected wiring closets · Physical access / facilities
- Physical security policy and facility risk assessment · Physical access / facilities
- Badge access system audit log and door alarm reports · Physical access / facilities
- Visitor sign in records with escort assignment · Physical access / facilities
governing documentDocuments that govern the control
- SSP PE-4 statement identifying protected distribution and transmission lines and the controls used (locked conduit, cages) · Policy repository / GRC workspace
First move
Common gaps auditors find
- Environmental sensor alerts route to unmonitored mailboxes
- Server room doors propped open during cooling failures
- CCTV coverage gaps at loading docks and equipment delivery areas
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-3(1) System Access · PE-5 Access Control for Output Devices (PE-5)