PE-15 Water Damage Protection (PE-15)
Water Damage Protection. Protect the system from damage resulting from water leakage by providing master shutoff or isolation valves that are accessible, working properly, and known to key personnel
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), PE-15. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- CCTV retention configuration and footage spot check evidence · Physical access / facilities
- Environmental monitoring readings for temperature, humidity, and water leak sensors · Physical access / facilities
periodic reviewEvidence produced at each review
- Facility drawings marking shutoff valves and records of valve checks · Physical access / facilities
- Visitor sign in records with escort assignment · Physical access / facilities
- Fire suppression and UPS maintenance records · Backup / DR tooling
governing documentDocuments that govern the control
- SSP PE-15 statement describing master water shutoff valves, their accessibility and staff awareness of their location · Policy repository / GRC workspace
First move
Common gaps auditors find
- Server room doors propped open during cooling failures
- CCTV coverage gaps at loading docks and equipment delivery areas
- Tailgating observed without challenge during walkthroughs
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetPE-14(2) Environmental Controls | Monitoring with Alarms and Notifications · PE-15(1) Automation Support