Maintain temperature and humidity within FedRAMP-defined acceptable levels; monitor at FedRAMP frequency.

Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), PE-14. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.

A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.

6
artefacts
2
held by a system
3
at each review
moderate
to go live
Physical access / facilities
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • CCTV retention configuration and footage spot check evidence · Physical access / facilities
  • Environmental monitoring readings for temperature, humidity, and water leak sensors · Physical access / facilities

periodic reviewEvidence produced at each review

  • Badge access system audit log and door alarm reports · Physical access / facilities
  • Visitor sign in records with escort assignment · Physical access / facilities
  • Fire suppression and UPS maintenance records · Backup / DR tooling

governing documentDocuments that govern the control

  • Control implementation statement for PE-14 citing the system mission and inheritance from common controls · Policy repository / GRC workspace

First move

Start with the 2 of 6 artefacts that already live in a system (Physical access / facilities); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

PE-13(2) Fire Protection | Suppression Systems: Automatic Activation and Notification (PE-13(2)) · PE-14(2) Environmental Controls | Monitoring with Alarms and Notifications