PE-11 Emergency Power (PE-11)

Emergency Power. Provide an uninterruptible power supply to facilitate Selection (one or more): an orderly shutdown of the system; transition of the system to long-term alternate power in the event of a primary power

Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), PE-11. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.

A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.

6
artefacts
1
held by a system
3
at each review
hard
to go live
Physical access / facilities
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Environmental monitoring readings for temperature, humidity, and water leak sensors · Physical access / facilities

periodic reviewEvidence produced at each review

  • Fire suppression and UPS maintenance records · Backup / DR tooling
  • Physical security policy and facility risk assessment · Physical access / facilities
  • Badge access system audit log and door alarm reports · Physical access / facilities

governing documentDocuments that govern the control

  • SSP PE-11 statement describing UPS capacity for orderly shutdown or transition to generator, largely inherited from the data centre provider · Policy repository / GRC workspace
  • Provider SOC 2 or FedRAMP package section covering UPS and generator testing · Policy repository / GRC workspace

First move

Mostly documents and reviews. Pull the 1 system-held artefact from your Physical access / facilities on a schedule; put the documents under version control with an owner and review date, and log each review as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

PE-10 Emergency Shutoff (PE-10) · PE-11(1) Alternate Power Supply Minimal Operational Capability