PE-1 Policy and Procedures
Develop, document, disseminate and review the policy for physical and environmental protection, and its procedures, on the FedRAMP-defined cadence: policy at least annually under High and at least every three years under Moderate, procedures at least annually and after significant changes under both.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), PE-1. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- CCTV retention configuration and footage spot check evidence · Physical access / facilities
- Environmental monitoring readings for temperature, humidity, and water leak sensors · Physical access / facilities
periodic reviewEvidence produced at each review
- Fire suppression and UPS maintenance records · Backup / DR tooling
- Physical security policy and facility risk assessment · Physical access / facilities
- Badge access system audit log and door alarm reports · Physical access / facilities
governing documentDocuments that govern the control
- SSP PE-1 statement naming the physical and environmental policy owner and noting which facilities are inherited from the IaaS provider · Policy repository / GRC workspace
- Physical and environmental protection policy with review date and inheritance table · Policy repository / GRC workspace
First move
Common gaps auditors find
- Visitor logs incomplete or escort sign offs missing
- Environmental sensor alerts route to unmonitored mailboxes
- Server room doors propped open during cooling failures
- CCTV coverage gaps at loading docks and equipment delivery areas
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheet