IR-4(2) Incident Handling | Dynamic Reconfiguration
Include FedRAMP-defined types of dynamic reconfiguration for FedRAMP-defined system components as part of the incident response capability.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), IR-4(2). The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Exercise records showing dynamic reconfiguration actually performed · Document repository
governing documentDocuments that govern the control
- Incident response plan section naming the components that can be dynamically reconfigured · Policy repository / GRC workspace
- Runbooks for isolation, rule changes or rerouting during an incident · Document repository
First move
Common gaps auditors find
- Capability exists technically but is not written into the incident response plan
- Never exercised, so the achievable change window is unknown
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetIR-4(1) Automated Incident Handling Processes · IR-4(4) Information Correlation