CP-9 System Backup
Conduct backups of user-level, system-level, and security-related documentation; FedRAMP-defined frequency (daily incremental, weekly full).
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), CP-9. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Backup job reports for a sample period and restore test results for user, system and documentation data · Backup / DR tooling
- Restoration test logs with success criteria signed off · Backup / DR tooling
- Backup schedule, retention, and offsite or immutable copy evidence · Backup / DR tooling
periodic reviewEvidence produced at each review
- Alternate processing site contract and capacity attestation · Vendor register / contract repository
governing documentDocuments that govern the control
- SSP CP-9 statement stating daily incremental and weekly full backup frequency, the data sets covered and backup encryption · Policy repository / GRC workspace
- Business impact analysis identifying critical systems · Document repository
- Contingency plan with recovery time and recovery point objectives · Policy repository / GRC workspace
First move
Common gaps auditors find
- Alternate site capacity not validated against current load
- Plan not updated after major architecture changes
- Backups taken but restore tests never performed end to end
- RTO and RPO targets undefined for tier two systems
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCP-8(4) Provider Contingency Plan · CP-9(1) Testing for Reliability and Integrity