CP-7 Alternate Processing Site
Establish alternate processing site with agreements for resumption of operations within FedRAMP-defined RTO.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), CP-7. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Backup schedule, retention, and offsite or immutable copy evidence · Backup / DR tooling
- Restoration test logs with success criteria signed off · Backup / DR tooling
periodic reviewEvidence produced at each review
- Annual tabletop and full failover test reports · Backup / DR tooling
- Alternate processing site contract and capacity attestation · Vendor register / contract repository
governing documentDocuments that govern the control
- SSP CP-7 statement naming the alternate processing site or region and how it supports resumption within the RTO · Document repository
- Failover architecture diagram and the latest failover test results to the alternate region · Policy repository / GRC workspace
- Business impact analysis identifying critical systems · Document repository
First move
Common gaps auditors find
- Tabletop exercises lack participation from business owners
- Alternate site capacity not validated against current load
- Plan not updated after major architecture changes
- Backups taken but restore tests never performed end to end
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCP-6(3) Alternate Storage Site | Accessibility (CP-6(3)) · CP-7(1) Alternate Processing Site | Separation from Primary Site (CP-7(1))