CP-4 Contingency Plan Testing

Test contingency plan at least annually (FedRAMP) using FedRAMP-defined tests; review test results.

Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), CP-4. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.

A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.

6
artefacts
2
held by a system
1
at each review
moderate
to go live
Backup / DR tooling
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Restoration test logs with success criteria signed off · Backup / DR tooling
  • Backup schedule, retention, and offsite or immutable copy evidence · Backup / DR tooling

periodic reviewEvidence produced at each review

  • Contingency plan test report with after-action items tracked to closure · Policy repository / GRC workspace

governing documentDocuments that govern the control

  • SSP CP-4 statement describing the annual functional test of the contingency plan, test scenarios and results review · Policy repository / GRC workspace
  • Business impact analysis identifying critical systems · Document repository
  • Contingency plan with recovery time and recovery point objectives · Policy repository / GRC workspace

First move

Start with the 2 of 6 artefacts that already live in a system (Backup / DR tooling); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

CP-3(1) Simulated Events · CP-4(1) Coordinate with Related Plans