CM-6 Configuration Settings
Establish/document configuration settings using checklists; CIS/USGCB/DISA STIG when available; HIGH baseline.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), CM-6. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Configuration compliance scan results against the chosen benchmark with approved deviation records · Vulnerability scanner / patch tooling
- Configuration drift detection reports from the CMDB or tooling · Cloud console / configuration management
- Software inventory generated from authoritative discovery tooling · Cloud console / configuration management
- Emergency change records with retroactive approvals · Cloud console / configuration management
- Approved baseline configurations for each platform family · Cloud console / configuration management
periodic reviewEvidence produced at each review
none for this control
governing documentDocuments that govern the control
- SSP CM-6 statement naming the benchmarks applied (CIS, USGCB, DISA STIG) per component and how deviations are approved · Policy repository / GRC workspace
- Configuration management policy and change control procedure · Policy repository / GRC workspace
First move
Common gaps auditors find
- Emergency changes bypass CAB and lack retrospective review
- Unauthorised software present on endpoints not flagged by tooling
- Hardening benchmarks applied at build but not re evaluated annually
- Asset inventory missing cloud workloads and ephemeral resources
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCM-5(5) Access Restrictions for Change | Privilege Limitation for Production and Operation (CM-5(5)) · CM-6(1) Automated Management, Application, and Verification