CA-8 Penetration Testing
Conduct penetration testing annually on FedRAMP-defined systems and components.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), CA-8. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Latest penetration test report with findings carried into the POA&M · Vulnerability scanner / patch tooling
- Control assessment report with tester names and dates · Document repository
governing documentDocuments that govern the control
- SSP CA-8 statement describing annual penetration testing scope aligned to the FedRAMP test guidance, including attack vectors and the tester · Policy repository / GRC workspace
- Independent assessor statement of independence · Document repository
- System security plan covering the authorization boundary · Policy repository / GRC workspace
- Plan of action and milestones tracking open findings · Policy repository / GRC workspace
- Authorization to operate memorandum signed by the authorizing official · Document repository
First move
Common gaps auditors find
- Continuous monitoring metrics collected but not reported to leadership
- Assessment scope omits inherited cloud provider controls
- Reauthorization scheduled past the policy required interval
- Authorization boundary description does not match the asset inventory
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCA-7(4) Continuous Monitoring | Risk Monitoring (CA-7(4)) · CA-8(1) Penetration Testing | Independent Penetration Testing Agent or Team (CA-8(1))