AU-6 Audit Record Review, Analysis, and Reporting
Review and analyze audit records at least weekly (FedRAMP); report findings to defined personnel.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), AU-6. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Audit log integrity controls including write once storage or hashing · SIEM / log platform
periodic reviewEvidence produced at each review
- Weekly audit review records or SIEM case notes with findings escalated to the named personnel · SIEM / log platform
- Time synchronisation evidence across logging endpoints · Endpoint management (MDM / EDR)
governing documentDocuments that govern the control
- SSP AU-6 statement describing weekly review of audit records, the tools used and who receives reported findings · Policy repository / GRC workspace
- Log review procedures with assigned analyst owners · Policy repository / GRC workspace
- Audit and accountability policy with retention periods defined · Policy repository / GRC workspace
- List of auditable events and log source inventory · Policy repository / GRC workspace
First move
Common gaps auditors find
- Clock drift across hosts breaks event correlation
- Privileged user activity not isolated for independent review
- Critical log sources missing from the SIEM with no detection coverage
- Audit log retention shorter than the policy mandated period
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetAU-5(2) Real-Time Alerts · AU-6(1) Automated Process Integration