AU-1 Policy and Procedures
Develop, document, disseminate and review the policy for audit and accountability, and its procedures, on the FedRAMP-defined cadence: policy at least annually under High and at least every three years under Moderate, procedures at least annually and after significant changes under both.
Source: FedRAMP High (NIST SP 800-53 Rev 5 baseline), AU-1. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open FedRAMP High (NIST SP 800-53 Rev 5 baseline) in the compliance library.
A FedRAMP baseline is a subset of NIST SP 800-53 Rev 5, enhancements included.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Audit log integrity controls including write once storage or hashing · SIEM / log platform
periodic reviewEvidence produced at each review
- SSP AU-1 statement naming the audit and accountability policy owner, review frequency and the logging procedure it points to · SIEM / log platform
- Time synchronisation evidence across logging endpoints · Endpoint management (MDM / EDR)
governing documentDocuments that govern the control
- Audit and accountability policy with dated review approval and change log · Policy repository / GRC workspace
- Audit and accountability policy with retention periods defined · Policy repository / GRC workspace
- List of auditable events and log source inventory · Policy repository / GRC workspace
First move
Common gaps auditors find
- Audit log retention shorter than the policy mandated period
- Reviewers acknowledge alerts but do not document investigation outcomes
- Clock drift across hosts breaks event correlation