BCR-11 Equipment Redundancy
Provide redundant units of business-critical equipment, sited far enough apart that one local event cannot take out both, using the separation industry standards call for.
4
artefacts
1
held by a system
1
at each review
moderate
to go live
Document repository
where the evidence lives
teal = a system already holds it · olive = produced at each review
system holds itEvidence a system already holds
- Site or location records showing the separation distance · Document repository
periodic reviewEvidence produced at each review
- Evidence redundancy has been failed over to or tested · Document repository
governing documentDocuments that govern the control
- The inventory of business-critical equipment and its redundant counterparts · Policy repository / GRC workspace
- The industry standard the separation was set against · Policy repository / GRC workspace
First move
Start with the 1 of 4 artefacts that already live in a system (Document repository); keep the periodic reviews but log each one as a dated record with a named reviewer.
Common gaps auditors find
- Redundant equipment in the same room or same power and cooling domain
- Redundancy assumed from a supplier claim and never tested
- No definition of which equipment is business-critical
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.