BCR-11 Equipment Redundancy

Provide redundant units of business-critical equipment, sited far enough apart that one local event cannot take out both, using the separation industry standards call for.

4
artefacts
1
held by a system
1
at each review
moderate
to go live
Document repository
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

  • Site or location records showing the separation distance · Document repository

periodic reviewEvidence produced at each review

  • Evidence redundancy has been failed over to or tested · Document repository

governing documentDocuments that govern the control

  • The inventory of business-critical equipment and its redundant counterparts · Policy repository / GRC workspace
  • The industry standard the separation was set against · Policy repository / GRC workspace

First move

Start with the 1 of 4 artefacts that already live in a system (Document repository); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet