EvidenceSheet

A&A-02 Independent Assessments

Commission audit and assurance assessments from assessors independent of the activity being examined, run them against recognised standards, and repeat them at least annually.

4
artefacts
0
held by a system
3
at each review
hard
to go live
Document repository
where the evidence lives
teal = a system already holds it · olive = produced at each review

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Assessment reports from the last twelve months naming the assessor · Document repository
  • Evidence of assessor independence such as an engagement letter or organisational chart showing separation · Document repository
  • Scope statement for each assessment · Policy repository / GRC workspace

governing documentDocuments that govern the control

  • The recognised standard each assessment was performed against · Policy repository / GRC workspace

First move

This control is evidenced by people and documents, not systems. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date. Do not try to automate it.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

A&A-01 Audit and Assurance Policy and Procedures · A&A-03 Risk Based Planning Assessment