SEF-06 Event Triage Processes
The organisation has defined and operating processes, procedures and tooling that support the business in sorting security-related events, so genuine incidents are separated out and routed, and it evaluates how well that triage works.
Source: CSA CCM v4.1, SEF-06. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.
Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Sample of triaged alerts showing classification decisions and escalations · SIEM / log platform
- Periodic review of false positive rates and triage effectiveness · Document repository
governing documentDocuments that govern the control
- Event triage procedure or runbook with classification and severity criteria · Policy repository / GRC workspace
- SIEM or SOAR rules and playbooks used to enrich and route alerts · Policy repository / GRC workspace
- Roles and shift coverage for the triage function · Policy repository / GRC workspace
First move
Common gaps auditors find
- Alerts triaged ad hoc with no written criteria
- Tooling generates alerts that nobody is assigned to review
- Triage effectiveness never evaluated, so alert fatigue goes unaddressed
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetSEF-05 Incident Response Metrics · SEF-07 Incident Management and Response