EvidenceSheet

LOG-07 Logging Scope

Decide, record and put in place which information, metadata and system events are logged. Revisit that logging scope at least once a year, whenever the threat environment changes, and in line with applicable regulation.

Source: CSA CCM v4.1, LOG-07. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.

Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.

4
artefacts
0
held by a system
1
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

none for this control

periodic reviewEvidence produced at each review

  • Scope review records, including reviews after threat changes · SIEM / log platform

governing documentDocuments that govern the control

  • Logging standard listing required events per system type · Policy repository / GRC workspace
  • Inventory of log sources against that standard · Policy repository / GRC workspace
  • Mapping of regulatory logging requirements to the scope · Policy repository / GRC workspace

First move

No system holds this evidence for you: it is people and documents. Reminders and routing to the owner still save time. Put the document under version control with an owner and review date, and log each review as a record with reviewer and date.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

LOG-06 Clock Synchronization · LOG-08 Audit Logs Sanitization