I&S-05 Production and Non-Production Environments

Keep production and non-production environments apart to lower the chance of sensitive production data turning up in non-production use, and sanitise or otherwise protect production data before any approved non-production use of it.

Source: CSA CCM v4.1, I&S-05. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.

Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.

5
artefacts
1
held by a system
1
at each review
hard
to go live
Policy repository / GRC workspace
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Data masking or synthetic data procedure and tool configuration · Cloud console / configuration management

periodic reviewEvidence produced at each review

  • Approval records for any use of production data outside production · Cloud console / configuration management

governing documentDocuments that govern the control

  • Architecture or account structure showing separate production and non-production environments · Policy repository / GRC workspace
  • Access control lists showing different access to each environment · Policy repository / GRC workspace
  • Data classification inventory per environment · Policy repository / GRC workspace

First move

Mostly documents and reviews. Pull the 1 system-held artefact from your Cloud console / configuration management on a schedule; put the documents under version control with an owner and review date, and log each review as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

I&S-04 OS Hardening and Base Controls · I&S-06 Segmentation and Segregation