I&S-02 Capacity and Resource Planning
Plan and track the availability, quality and capacity of resources so the system performs as the business requires.
Source: CSA CCM v4.1, I&S-02. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.
Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Monitoring dashboards and alerts for utilisation, latency and saturation · SIEM / log platform
- Records of capacity actions taken when thresholds were reached · Cloud console / configuration management
periodic reviewEvidence produced at each review
none for this control
governing documentDocuments that govern the control
- Documented business performance requirements or SLOs · Policy repository / GRC workspace
- Capacity plans and forecasts with review dates · Policy repository / GRC workspace
First move
Common gaps auditors find
- Capacity monitored but never compared with documented business requirements
- No forecast, so scaling is only reactive
- Capacity alerts with no assigned responder
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetI&S-01 Infrastructure and Virtualization Security Policy and Procedures · I&S-03 Network Security