DCS-18 Datacenter Operations Resilience
Processes, procedures and technical measures are defined, put in place and assessed so that the datacenter can keep operating without interruption.
Source: CSA CCM v4.1, DCS-18. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.
Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Incident records of outages and recovery times against targets · Document repository
periodic reviewEvidence produced at each review
- Failover and high-availability test reports · Backup / DR tooling
governing documentDocuments that govern the control
- Datacenter resilience design showing redundant power, cooling and network paths · Policy repository / GRC workspace
- Continuity requirements derived from risk assessment and critical service list · Policy repository / GRC workspace
- Maintenance procedures that avoid single points of failure during work · Policy repository / GRC workspace
First move
Common gaps auditors find
- Redundancy designed but failover never exercised
- Concurrent maintainability not considered, so maintenance causes outages
- Resilience requirements not linked to the services customers depend on
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetDCS-17 Datacenter Metrics · DSP-01 Security and Privacy Policy and Procedures