CCC-07 Detection of Baseline Deviation
Detection measures with proactive alerting are put in place for changes that depart from the established baseline.
Source: CSA CCM v4.1, CCC-07. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.
Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Configuration drift detection tooling and its rule set · SIEM / log platform
- Sample alerts for baseline deviations and their resolution · SIEM / log platform
- Alert routing showing who is notified · SIEM / log platform
periodic reviewEvidence produced at each review
- Reports of drift found and corrected over a period · SIEM / log platform
governing documentDocuments that govern the control
none for this control
First move
Common gaps auditors find
- Drift detection runs but alerts go unread
- Coverage limited to part of the estate
- Deviations accepted without any approval
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetCCC-06 Change Management Baseline · CCC-08 Exception Management