CCC-03 Change Management Technology
A change management procedure is put in place to control the risk that comes from changing assets the organisation owns, controls or uses.
Source: CSA CCM v4.1, CCC-03. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.
Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Change tickets with risk rating and impact analysis · Ticketing / ITSM
- Change management tooling configuration (for example ticket workflow requiring risk fields) · Ticketing / ITSM
periodic reviewEvidence produced at each review
- Records of changes to supplier-managed assets passing through the procedure · Ticketing / ITSM
governing documentDocuments that govern the control
- Change management procedure including risk assessment of each change · Policy repository / GRC workspace
First move
Common gaps auditors find
- Risk of change assessed informally or not recorded
- Outsourced asset changes outside the procedure
- Standard changes never reviewed for risk