A&A-02 Independent Assessments
Independent audit and assurance assessments are carried out against the relevant standards at a minimum of once a year.
Source: CSA CCM v4.1, A&A-02. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CSA CCM v4.1 in the compliance library.
Version 4.1 adds 11 controls (among them API security, log sanitisation and a service bill of materials) and renumbers several domains. CSA accepts v4.0.x during its transition; if your STAR assessment is still on v4.0.1, check the numbering against it.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Most recent independent assessment report (for example SOC 2 Type 2, ISO/IEC 27001 surveillance or STAR Level 2) with its period of coverage · Document repository
- Management oversight minutes reviewing assessment results · Policy repository / GRC workspace
governing documentDocuments that govern the control
- Register of applicable standards and regulations used to scope assessments · Policy repository / GRC workspace
- Annual audit plan showing each assessment scheduled · Policy repository / GRC workspace
- Engagement letters or auditor statements confirming the assessor's independence · Document repository
First move
Common gaps auditors find
- Assessment performed by staff who operate the controls under review
- Gap of more than a year between assessment periods
- Scope of the independent assessment excludes some cloud services offered
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetA&A-01 Audit and Assurance Policy and Procedures · A&A-03 Risk Based Planning Assessment