MA.L2-3.7.3 Equipment Sanitization
Remove CUI from equipment by sanitization before that equipment leaves the organization for off site maintenance.
Source: CMMC 2.0, MA.L2-3.7.3. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open CMMC 2.0 in the compliance library.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Sanitization records tied to specific equipment · Data governance / DLP tooling
governing documentDocuments that govern the control
- Sanitization procedure for equipment leaving for maintenance · Policy repository / GRC workspace
- Verification step confirming CUI removal · Document repository
First move
Common gaps auditors find
- Equipment sent to vendors without sanitization
- Sanitization claimed but not verified or recorded
- Embedded storage in peripherals overlooked
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetMA.L2-3.7.2 System Maintenance Control · MA.L2-3.7.4 Media Inspection