OPS-10 Logging and Monitoring - Concept
Establish written logging and monitoring policies for systems in the provider's area of responsibility that define which events could breach protection goals, how logs are activated, paused and stopped, their purpose and retention, role responsibilities, time synchronisation and legal obligations.
Source: BSI C5 (121-criteria catalogue), OPS-10. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
none for this control
periodic reviewEvidence produced at each review
- Responsibility matrix naming owners of log configuration and of log review · SIEM / log platform
governing documentDocuments that govern the control
- Logging policy listing the event types classified as security relevant · Policy repository / GRC workspace
- Documented retention period per log source with the legal basis cited · Policy repository / GRC workspace
- Time synchronisation standard specifying the authoritative time sources · Policy repository / GRC workspace
First move
Common gaps auditors find
- Policy enumerates log sources yet never defines which events matter
- No rule stating who may pause or switch off logging on a system
- Retention periods in the policy inconsistent with the platform configuration
- No authoritative time source defined, so records across components cannot be correlated
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetOPS-09 Data Backup and Recovery - Storage · OPS-11 Logging and Monitoring - Metadata Management Concept